Project Description
Location: Uzbekistan
Year Completed: 2017
Power plant erection 900 MW; 2 HRSG vertical type; BOP SYSTEMS; related auxiliary systems and piping.
In addition to that, the erection and the pre-commissioning of two power blocks consisting of two HIP/LP Fuji steam turbines 142MW each capacity and two MHI Gas turbines M701F 310 MW capacity each was performed.