Project Description
3-phases System, Green dispensary
3-phases System, Green dispensary
Residential Area, Hybrid Solar Batterie Utility system with back power
500 KVA On Grid tie solar system with few saver control, 770 Panels each bifacial dual glass, Multi bus bar technology
Location: China
Intervention type: Onshore
Turbine Power Capacity: 2.4 GW
Maintenance of a 2.4 GW hydro turbine.
Intervention type: Offshore
Location: China
Year Completed: 2018
Pre-commissioning of 6 MW wind turbine
Location: Germany, North Sea
Intervention type: Offshore
Year Completed: 2018- ongoing
Commissioning of 6 MW wind turbine
Location: France
Intervention type: Onshore
Year Completed: 2017
Pre-commissioning of 6 MW wind turbine
Intervention type: Photovoltaic
Location: France
Power: 10 MW and 6 MW
Year Completed: 2011
Commissioning and maintenance for solar farm.
Intervention type: Onshore
Location: China
Turbine Power Capacity: 350 MW
Year Completed: 2006
Commissioning of the SD7000 converter used for the 350 MW hydro turbine as a Pump storage system.